NASA helium flow problem likely delays Artemis II crewed Moon flyby beyond March window
The facts
- NASA has identified an interruption in helium flow in the upper stage of its Space Launch System rocket for the Artemis II mission, discovered overnight on Friday after a major fueling test.
- NASA and its leadership say the helium flow problem will almost certainly or definitively take the March launch window for Artemis II out of consideration, likely delaying the mission beyond early March.
- NASA is reviewing data on the helium issue and preparing to potentially roll the Artemis II Space Launch System rocket and Orion spacecraft back from Launch Pad 39B to the Vehicle Assembly Building at Kennedy Space Center for investigation and possible repairs.
- The helium flow problem is separate from earlier hydrogen fuel leaks that affected a previous countdown or wet dress rehearsal test for Artemis II in early February.
- Before the helium issue was found, NASA had completed a second wet dress rehearsal or full fueling test for Artemis II at Kennedy Space Center that was reported as successful, with hydrogen leak problems from the first test resolved.
- Following the successful fueling test, NASA had been targeting 6 March as the earliest possible launch date for Artemis II, opening a launch window in early March.
- Artemis II is planned as a crewed lunar flyby mission of about 10 days that will send four astronauts around the far side of the Moon and back to Earth without landing.
- The Artemis II crew consists of three NASA astronauts—Reid Wiseman, Victor Glover, and Christina Koch—and Canadian Space Agency astronaut Jeremy Hansen.
Context
What exactly is the helium problem affecting the Artemis II rocket?
NASA reported an interruption in the flow of helium to the Space Launch System rocket’s upper stage, specifically the interim cryogenic propulsion stage, detected overnight after a fueling test; continuous helium flow is required to maintain proper conditions and pressurize the propellant tanks for launch. CBC News,BBC,BBC,Guardian,Fox News,Daily Mail,Daily Mail
How does this helium issue affect the planned March launch of Artemis II?
NASA and Administrator Jared Isaacman have said the helium flow problem will "almost assuredly" or definitively remove the March launch window from consideration, meaning the mission will not launch in early March as previously targeted and may require rolling the rocket back to the Vehicle Assembly Building for further work. BBC,BBC,Guardian,Daily Mail,Daily Mail,Hindustan Times
What is the goal of the Artemis II mission and who is on board?
Artemis II is designed as a roughly 10‑day test flight that will send four astronauts around the far side of the Moon and back to Earth, marking the first crewed journey to the Moon in more than 50 years and the furthest human spaceflight to date; the crew is Reid Wiseman, Victor Glover, Christina Koch, and Canadian astronaut Jeremy Hansen. BBC,TimesNow,BBC,BBC,BBC,uol.com.br,uol.com.br,infobae,Daily Mail,MARCA,MARCA,MARCA,India Today
The receipts — 100 sources
Wire services (5)
Other coverage (95)
A news briefing built to show both sides.
The day’s biggest stories in one short brief, built to show both sides and the competing values behind the headlines. Free in your inbox.